{"id":29546,"date":"2023-07-12T10:00:00","date_gmt":"2023-07-12T08:00:00","guid":{"rendered":"https:\/\/www.eolus.com\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/"},"modified":"2024-02-20T14:02:33","modified_gmt":"2024-02-20T13:02:33","slug":"eolus-applies-for-permit-for-vastvind-offshore-wind-power-project","status":"publish","type":"mfn_news","link":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/","title":{"rendered":"Eolus applies for permit for V\u00e4stvind offshore wind power project"},"content":{"rendered":"<div class=\"mfn-preamble\">\n<p class=\"mfn-wp-retain\"><strong>Eolus has filed a permit application for the V&auml;stvind wind power project, located west of Gothenburg. The project consists of up to 50 turbines with an installed capacity of 1,000 MW and estimated annual electricity generation of approximately 4 TWh.<\/strong><\/p>\n<\/div>\n<div class=\"mfn-body\">\n<p class=\"mfn-wp-retain\">The offshore wind power project is situated off the western coast of Sweden, outside &Ouml;cker&ouml; and Kung&auml;lv. The project can potentially be completed by 2029 and provide a significant addition of green electricity as required by the major companies in the region as well as other operations. One example of such operations is the Port of Gothenburg, which stands on the threshold of a green transition and thus a sharp increase in its electricity requirements between now and 2030. As part of its commitment to secure the supply of green electricity, G&ouml;teborgs Hamn AB has become a joint owner with a 5% stake in the project.<\/p>\n<p class=\"mfn-wp-retain\">&ldquo;The annual electricity generation from V&auml;stvind is equivalent to all current electricity consumption in Gothenburg. Electricity supply is a critical issue for the region&rsquo;s continued development and during the spring, the County Governor stated that several offshore wind power projects need to be built in V&auml;stra G&ouml;taland over the coming years &ndash; as well as more onshore wind power projects &ndash; to meet the need for 15 TWh of new electricity generation by 2030. Major electricity generation projects in the region that can be completed before 2030 are in short supply. V&auml;stvind can be completed by 2029 and is thus necessary if the region is to have a chance of achieving its goal,&rdquo; says Per Witalisson, CEO of Eolus.<\/p>\n<p class=\"mfn-wp-retain\">&ldquo;Without the addition of new electricity generation, the region&rsquo;s development and thus jobs in the automotive and chemicals industries are under threat. The wind power project itself will create a large number of jobs in the locality, both during the construction phase and when the farm is in operation. Based on a study of incentives and compensation in connection with wind power establishments presented in the spring, the municipalities of &Ouml;cker&ouml; and Kung&auml;lv can also expect to receive several million Swedish kronor per year earmarked for local activities if the proposal is implemented.&rdquo;<\/p>\n<p class=\"mfn-wp-retain\">The permit application is to be processed by both the Land and Environment Court in V&auml;stra G&ouml;taland and the government, as the project is situated in territorial waters, which is the responsibility of the Land and Environment Court, and in Sweden&rsquo;s economic zone, for which the government is responsible for granting permits. The permit application, including the environmental impact assessment, will be circulated for consultation among relevant stakeholders prior to a decision being taken on the permit.<\/p>\n<p class=\"mfn-wp-retain\">&ldquo;I am very pleased that we have now filed the permit application and are thus moving the project forward. Sweden has robust environmental laws and we hope that the feedback from the consultation process will be constructive and will help make the project even better. Our aim is to engage in ongoing dialogue with commercial fisheries, the Swedish Armed Forces, the municipalities and other stakeholders to identify constructive solutions for coexistence that will also allow us to support the development of the stakeholders&rsquo; operations. Commercial fisheries have a long tradition on the west coast of Sweden and are an important supplier of food. We have initiated dialogue with them for the purpose of discussing remuneration and compensatory measures for the impact caused by the farm,&rdquo; says Anna Lundsg&aring;rd, Head of Offshore at Eolus.<\/p>\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">About the electricity situation in V&auml;stra G&ouml;taland<\/strong><br \/>V&auml;stra G&ouml;taland is the region in Sweden with by far the highest number of people working in the industrial sector. Electricity generation in V&auml;stra G&ouml;taland currently accounts for less than one third of the region&rsquo;s electricity consumption. The Council for the Green Transition in V&auml;stra G&ouml;taland (Sw: R&aring;det f&ouml;r gr&ouml;n industriomst&auml;llning i V&auml;stra G&ouml;taland), which is led by the<strong> <\/strong>County Governor and the chair of the regional council, has stated that a further 15 TWh of new fossil-free electricity generation is required by 2030 to meet the requirements of the current industrial transition and approved new establishments, such as the two battery factories. The Council has identified offshore wind power as the principal source of new electricity generation in V&auml;stra G&ouml;taland in the period through 2030. (<em>Source in Swedish: <\/em><em><a href=\"https:\/\/www.lansstyrelsen.se\/download\/18.579396b51864b78272023cbe\/1676971374013\/Brev-till-Busch-och-Pourmokhtari.pdf\" rel=\"noopener\" target=\"_blank\">https:\/\/www.lansstyrelsen.se\/download\/18.579396b51864b78272023cbe\/1676971374013\/Brev-till-Busch-och-Pourmokhtari.pdf<\/a><\/em><em>)<\/em><\/p>\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">About the V&auml;stvind wind farm<\/strong><br \/><strong>Planned capacity:<\/strong> 1,000 MW<br \/><strong>Planned electricity generation: <\/strong>4&ndash;4.5 TWh per year<br \/><strong>No. of turbines: <\/strong>Up to 50 turbines with a maximum total height of 320 meters.<br \/><strong>Ownership structure:<\/strong> Eolus Offshore AB: 95%, G&ouml;teborgs Hamn AB: 5%<br \/><strong>Planned start of construction:<\/strong> 2027<br \/><strong>Planned completion:<\/strong> 2029<br \/>Read more about the project at <a href=\"https:\/\/www.eolusvind.com\/projekt\/havsbaserad-vind\/vastvind-vindkraftpark\/\" rel=\"noopener\" target=\"_blank\">eolusvind.com\/vastvind<\/a> (in Swedish).<\/p>\n<\/div>\n<div class=\"mfn-footer mfn-dcfc8eab1ea7\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">For further information, please contact:<\/strong><br \/>Per Witalisson, CEO, +46 702 65 16 15<br \/>Anna Lundsg&aring;rd, Head of Offshore, +46 730 62 65 26<br \/>Karin Wittsell Heydl, Head of Communications &amp; Sustainability, Tel: +46 761 16 71 99<\/p>\n<\/div>\n<div class=\"mfn-footer mfn-about mfn-c79fb27d3da4\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">ABOUT EOLUS<\/strong><br \/>Eolus is one of the leading developers of renewable energy in the Nordics and we are active in the whole value chain from development of green field projects to construction and operation of renewable projects. We offer attractive and competitive investments in the Nordic and Baltic countries, Poland and the United States. Founded in 1990, Eolus has constructed 738 wind turbines with a capacity of 1,814 MW. Eolus has signed contracts for 1,150 MW of asset management services of which 825 MW are in operation.<br \/>Eolus&rsquo; Class B share is traded on Nasdaq Stockholm Mid Cap. For further information, please visit <a href=\"http:\/\/www.eolusvind.com.\" rel=\"noopener\" target=\"_blank\">www.eolusvind.com<\/a>.<\/p>\n<\/div>\n<div class=\"mfn-footer mfn-attachment mfn-attachment-image\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">Image Attachments<\/strong><br \/><a href=\"https:\/\/storage.mfn.se\/444b7049-c38e-4ce0-b6e2-a7115325f04f\/offshore-wind-power.jpeg\" rel=\"noopener\" target=\"_blank\">Offshore Wind Power<\/a><br \/><a href=\"https:\/\/storage.mfn.se\/94578e8d-0646-451a-a5b7-bc3ac809de0b\/vastvind-map.png\" rel=\"noopener\" target=\"_blank\">V&auml;stvind Map<\/a><br \/><a href=\"https:\/\/storage.mfn.se\/9b458558-511e-4987-a8a5-8e938886e8f5\/per-witalisson-ceo-eolus.jpeg\" rel=\"noopener\" target=\"_blank\">Per Witalisson, CEO, Eolus<\/a><br \/><a href=\"https:\/\/storage.mfn.se\/2aed6169-38b3-47d7-b087-a88153fd4d44\/anna-lundsgard-head-of-offshore-eolus.jpeg\" rel=\"noopener\" target=\"_blank\">Anna Lundsg&aring;rd, Head of Offshore, Eolus<\/a><\/p>\n<\/div>\n<div class=\"mfn-footer mfn-attachment mfn-attachment-general\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">Attachments<\/strong><br \/><a class=\"mfn-generated mfn-primary\" href=\"https:\/\/storage.mfn.se\/cfc68005-7572-4962-8670-f0d165d6ccc5\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project.pdf\" rel=\"noopener\" target=\"_blank\">Eolus applies for permit for V&auml;stvind offshore wind power project<\/a><\/p>\n<\/div>\n<script>\n                Array.prototype.slice.call(document.querySelectorAll(\".mfn-footer.mfn-attachment\")).forEach(function (el) { el.remove() });\n            <\/script>\n        <div class=\"mfn-attachments-container\"><div class=\"mfn-attachment mfn-primary\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/cfc68005-7572-4962-8670-f0d165d6ccc5\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project.pdf\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/cfc68005-7572-4962-8670-f0d165d6ccc5\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project.pdf?type=jpg\"><\/span>Eolus applies for permit for V\u00e4stvind offshore wind power project<\/a><\/div><div class=\"mfn-attachment\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/444b7049-c38e-4ce0-b6e2-a7115325f04f\/offshore-wind-power.jpeg\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/444b7049-c38e-4ce0-b6e2-a7115325f04f\/offshore-wind-power.jpeg?size=w-512\"><\/span>Offshore Wind Power<\/a><\/div><div class=\"mfn-attachment\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/94578e8d-0646-451a-a5b7-bc3ac809de0b\/vastvind-map.png\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/94578e8d-0646-451a-a5b7-bc3ac809de0b\/vastvind-map.png?size=w-512\"><\/span>V\u00e4stvind Map<\/a><\/div><div class=\"mfn-attachment\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/9b458558-511e-4987-a8a5-8e938886e8f5\/per-witalisson-ceo-eolus.jpeg\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/9b458558-511e-4987-a8a5-8e938886e8f5\/per-witalisson-ceo-eolus.jpeg?size=w-512\"><\/span>Per Witalisson, CEO, Eolus<\/a><\/div><div class=\"mfn-attachment\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/2aed6169-38b3-47d7-b087-a88153fd4d44\/anna-lundsgard-head-of-offshore-eolus.jpeg\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/2aed6169-38b3-47d7-b087-a88153fd4d44\/anna-lundsgard-head-of-offshore-eolus.jpeg?size=w-512\"><\/span>Anna Lundsg\u00e5rd, Head of Offshore, Eolus<\/a><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Eolus has filed a permit application for the V&auml;stvind wind power project, located west of Gothenburg. The project consists of up to 50 turbines with an installed capacity of 1,000 MW and estimated annual electricity generation of approximately 4 TWh. The offshore wind power project is situated off the western coast of Sweden, outside &Ouml;cker&ouml; [&hellip;]<\/p>\n","protected":false},"featured_media":37517,"template":"","class_list":["post-29546","mfn_news","type-mfn_news","status-publish","has-post-thumbnail","hentry","mfn-news-tag-mfn-ca","mfn-news-tag-mfn-lang-en","mfn-news-tag-mfn-type-ir","mfn-news-tag-mfn","mfn-news-tag-mfn-ca-other"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Eolus applies for permit for V\u00e4stvind offshore wind power project - Eolus<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eolus applies for permit for V\u00e4stvind offshore wind power project - Eolus\" \/>\n<meta property=\"og:description\" content=\"Eolus has filed a permit application for the V&auml;stvind wind power project, located west of Gothenburg. The project consists of up to 50 turbines with an installed capacity of 1,000 MW and estimated annual electricity generation of approximately 4 TWh. The offshore wind power project is situated off the western coast of Sweden, outside &Ouml;cker&ouml; [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Eolus\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-20T13:02:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eolus.com\/wp-content\/uploads\/2023\/07\/offshore-wind-power-13.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2120\" \/>\n\t<meta property=\"og:image:height\" content=\"1414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/\",\"url\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/\",\"name\":\"Eolus applies for permit for V\u00e4stvind offshore wind power project - Eolus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eolus.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/offshore-wind-power-14.jpeg\",\"datePublished\":\"2023-07-12T08:00:00+00:00\",\"dateModified\":\"2024-02-20T13:02:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eolus.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/offshore-wind-power-14.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.eolus.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/offshore-wind-power-14.jpeg\",\"width\":2120,\"height\":1414},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eolus.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MFN News Items\",\"item\":\"https:\\\/\\\/www.eolus.com\\\/blog\\\/mfn_news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Eolus applies for permit for V\u00e4stvind offshore wind power project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/#website\",\"url\":\"https:\\\/\\\/www.eolus.com\\\/\",\"name\":\"Eolus\",\"description\":\"Shaping the future of renewable energy\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eolus.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Eolus applies for permit for V\u00e4stvind offshore wind power project - Eolus","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/","og_locale":"en_US","og_type":"article","og_title":"Eolus applies for permit for V\u00e4stvind offshore wind power project - Eolus","og_description":"Eolus has filed a permit application for the V&auml;stvind wind power project, located west of Gothenburg. The project consists of up to 50 turbines with an installed capacity of 1,000 MW and estimated annual electricity generation of approximately 4 TWh. The offshore wind power project is situated off the western coast of Sweden, outside &Ouml;cker&ouml; [&hellip;]","og_url":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/","og_site_name":"Eolus","article_modified_time":"2024-02-20T13:02:33+00:00","og_image":[{"width":2120,"height":1414,"url":"https:\/\/www.eolus.com\/wp-content\/uploads\/2023\/07\/offshore-wind-power-13.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/","url":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/","name":"Eolus applies for permit for V\u00e4stvind offshore wind power project - Eolus","isPartOf":{"@id":"https:\/\/www.eolus.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/#primaryimage"},"image":{"@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eolus.com\/wp-content\/uploads\/2023\/07\/offshore-wind-power-14.jpeg","datePublished":"2023-07-12T08:00:00+00:00","dateModified":"2024-02-20T13:02:33+00:00","breadcrumb":{"@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/#primaryimage","url":"https:\/\/www.eolus.com\/wp-content\/uploads\/2023\/07\/offshore-wind-power-14.jpeg","contentUrl":"https:\/\/www.eolus.com\/wp-content\/uploads\/2023\/07\/offshore-wind-power-14.jpeg","width":2120,"height":1414},{"@type":"BreadcrumbList","@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-applies-for-permit-for-vastvind-offshore-wind-power-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eolus.com\/"},{"@type":"ListItem","position":2,"name":"MFN News Items","item":"https:\/\/www.eolus.com\/blog\/mfn_news\/"},{"@type":"ListItem","position":3,"name":"Eolus applies for permit for V\u00e4stvind offshore wind power project"}]},{"@type":"WebSite","@id":"https:\/\/www.eolus.com\/#website","url":"https:\/\/www.eolus.com\/","name":"Eolus","description":"Shaping the future of renewable energy","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eolus.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/mfn_news\/29546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/mfn_news"}],"about":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/types\/mfn_news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/media\/37517"}],"wp:attachment":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/media?parent=29546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}