{"id":41432,"date":"2024-02-26T12:40:00","date_gmt":"2024-02-26T11:40:00","guid":{"rendered":"https:\/\/www.eolus.com\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/"},"modified":"2024-02-26T13:24:00","modified_gmt":"2024-02-26T12:24:00","slug":"eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge","status":"publish","type":"mfn_news","link":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/","title":{"rendered":"Eolus submits application for offshore wind project outside the coast of Blekinge"},"content":{"rendered":"<div class=\"mfn-preamble\">\n<p class=\"mfn-wp-retain\"><strong>The Blekinge Offshore wind farm, located within the municipalities of Karlshamn and S\u00f6lvesborg, comprises up to 70 wind turbines with a production of approximately 4.3 TWh of renewable electricity per year. This represents a significant addition for southern Sweden and the Blekinge Region, which sees offshore wind power as an opportunity to increase self-sufficiency in electricity at competitive prices.<\/strong><\/p>\n<\/div>\n<div class=\"mfn-body\">\n<p class=\"mfn-wp-retain\">\u201cThe technical conditions are incredibly good with shallow waters and proximity to the power grid, which allows us to build with existing technology. This makes Blekinge Offshore an optimal project for those who want more electricity production and lower electricity prices in southern Sweden,&#8221; says Per Witalisson, CEO of Eolus.<\/p>\n<p class=\"mfn-wp-retain\">Blekinge Offshore is owned by Eolus and the local company Vingkraft, which initiated the project.<\/p>\n<p class=\"mfn-wp-retain\">\u201cWe are now submitting a completely revised application to build Blekinge Offshore. The project is important for the future of the region, and we can build it without compromising the living creatures and valuable environments that exist in the sea,\u201d says Anders Nilsson, CEO of Blekinge Offshore and initiator of the project.<\/p>\n<p class=\"mfn-wp-retain\">Blekinge Offshore is located at its closest about eleven kilometers from the mainland, and about five kilometers east of Han\u00f6, in an area identified as suitable for energy production in the coastal plans of Blekinge\u2019s coastal municipalities. In 2016, the Swedish government rejected an earlier application in the area, citing the interests of the Swedish Armed Forces. The objections then concerned that the previous project area encroached on parts of a marine training area and that the distance between the wind turbines was too small. Since 2021, a new project has been developed with 40 percent less area, 90 percent fewer turbines, and a quadrupled distance \u2013 which means two kilometers \u2013 between them. Further measures to accommodate the Swedish Armed Forces have been developed in regional collaboration.<\/p>\n<p class=\"mfn-wp-retain\">\u201cTogether with the Blekinge Region and the municipalities of Kristianstad and Simrishamn, we have opened up to offer the Swedish Armed Forces an extended area for marine exercises in Han\u00f6 Bay. Our proposal for an expansion of 770 square kilometers corresponds to an area five times larger than Blekinge Offshore. From the perspective of the coastal municipalities and the region, we are very eager for the project to proceed,\u201d says Birgit Birgersson-Brorsson (S), Chair of the Municipal Council in S\u00f6lvesborg, and Kith M\u00e5rtensson (M), Vice Chair of the Municipal Council in S\u00f6lvesborg.<\/p>\n<p class=\"mfn-wp-retain\">Johan Dal\u00e9n is the regional director of the Confederation of Swedish Enterprise in Sk\u00e5ne and Blekinge, and for him, it has become increasingly clear that southern Sweden must create opportunities for more electricity production.<\/p>\n<p class=\"mfn-wp-retain\">\u201cWe must stop putting different types of energy against each other and instead embrace every kWh that we can produce ourselves in electricity price area 4 \u2013 regardless of how it is produced. In this way, we create jobs instead of risking losing investments and establishments due to uncertainty in electricity supply and higher electricity prices than surrounding regions,\u201d says Johan Dal\u00e9n.<\/p>\n<p class=\"mfn-wp-retain\">During a press conference in Nogersund on Monday morning, local fishermen were also present.<\/p>\n<p>\u201cBlekinge Offshore does not encroach on fishing. Rather, it becomes a very good nursery habitat for fish that like to hide by the foundations,&#8221; says Lennart Arvidsson, a local fisherman.&#8221;<\/p>\n<p class=\"mfn-wp-retain\">The application for an environmental permit has now been submitted to the Land and Environment Court in V\u00e4xj\u00f6. An application to conduct investigations on the seabed and lay underwater cables has also been sent to the Ministry of Climate and Enterprise. The applications, including an environmental impact assessment with accompanying investigations, will be sent out for consultation to concerned stakeholders before a decision on the permit is made.<\/p>\n<p class=\"mfn-wp-retain\"><strong>About Blekinge Offshore:<\/strong><br \/>\nNumber of turbines: max. 70<br \/>\nInstalled effect: 1000 MW<br \/>\nDistance from shore: approx. 11 km (5 km to Han\u00f6)<br \/>\nHeight: max. 330 meters to tip of the blade<br \/>\nFoundations: Gravity-based bottom-fixed foundations<br \/>\nPossible start of construction: 2027<\/p>\n<\/div>\n<div class=\"mfn-footer mfn-5d493b5e2372\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">For further information, please contact:<\/strong><br \/>\nPer Witalisson, CEO, Eolus, +46 702 65 16 15, <a href=\"mailto:per.witalisson@eolusvind.com\" target=\"_blank\" rel=\"noopener\">per.witalisson@eolusvind.com<\/a><br \/>\nAnna Lundsg\u00e5rd, Head of Offshore, Eolus, +46 73 062 65 26, <a href=\"mailto:anna.lundsgard@eolusvind.com\" target=\"_blank\" rel=\"noopener\">anna.lundsgard@eolusvind.com<\/a><br \/>\nAnders Nilsson, Vingkraft, +46 733 27 77 96<\/p>\n<\/div>\n<div class=\"mfn-footer mfn-about mfn-c79fb27d3da4\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">ABOUT EOLUS<\/strong><br \/>\nEolus\u00a0is a leading developer of\u00a0innovative and customized renewable energy solutions. We\u00a0offer attractive and sustainable investments in the Nordics, the Baltics, Poland and the USA. From development of green field projects to construction and operation of renewable energy assets, we are part of the entire value chain. For over three decades we have worked for\u00a0a future where everyone can lead a fulfilling, yet sustainable life. Today, our project portfolio includes more than 26 GW wind, solar and energy storage projects. Eolus \u2013 shaping the future of renewable energy.<\/p>\n<p class=\"mfn-wp-retain\">Eolus\u2019s Class B share is listed on Nasdaq Stockholm. <a href=\"https:\/\/www.eolus.com\" target=\"_blank\" rel=\"noopener\">www.eolus.com<\/a><\/p>\n<\/div>\n<div class=\"mfn-footer mfn-attachment mfn-attachment-image\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">Image Attachments<\/strong><br \/>\n<a href=\"https:\/\/storage.mfn.se\/1ff93211-6f67-43dd-9918-2061ef69205a\/blekinge-offshore-photo-montage-aerial-view.jpeg\" target=\"_blank\" rel=\"noopener\">Blekinge Offshore, photo montage &#8211; aerial view<\/a><br \/>\n<a href=\"https:\/\/storage.mfn.se\/6d8fabf8-dd4c-4347-b463-0e7c0d5473c2\/blekinge-offshore-photo-montage-nogersund.jpeg\" target=\"_blank\" rel=\"noopener\">Blekinge Offshore, photo montage &#8211; Nogersund<\/a><br \/>\n<a href=\"https:\/\/storage.mfn.se\/b63dbe3e-5e4d-402b-8b60-87a9f0ef11b1\/blekinge-offshore-map.jpeg\" target=\"_blank\" rel=\"noopener\">Blekinge Offshore- map<\/a><\/p>\n<\/div>\n<div class=\"mfn-footer mfn-attachment mfn-attachment-general\">\n<p class=\"mfn-wp-retain\"><strong class=\"mfn-heading-1\">Attachments<\/strong><br \/>\n<a class=\"mfn-generated mfn-primary\" href=\"https:\/\/storage.mfn.se\/49da8ef6-de2d-461a-b396-6ac2ac6f221e\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge.pdf\" target=\"_blank\" rel=\"noopener\">Eolus submits application for offshore wind project outside the coast of Blekinge<\/a><\/p>\n<\/div>\n<script>\n                Array.prototype.slice.call(document.querySelectorAll(\".mfn-footer.mfn-attachment\")).forEach(function (el) { el.remove() });\n            <\/script>\n        <div class=\"mfn-attachments-container\"><div class=\"mfn-attachment mfn-primary\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/49da8ef6-de2d-461a-b396-6ac2ac6f221e\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge.pdf\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/49da8ef6-de2d-461a-b396-6ac2ac6f221e\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge.pdf?type=jpg\"><\/span>Eolus submits application for offshore wind project outside the coast of Blekinge<\/a><\/div><div class=\"mfn-attachment mfn-image-primary\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/1ff93211-6f67-43dd-9918-2061ef69205a\/blekinge-offshore-photo-montage-aerial-view.jpeg\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/1ff93211-6f67-43dd-9918-2061ef69205a\/blekinge-offshore-photo-montage-aerial-view.jpeg?size=w-512\"><\/span>Blekinge Offshore, photo montage - aerial view<\/a><\/div><div class=\"mfn-attachment\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/6d8fabf8-dd4c-4347-b463-0e7c0d5473c2\/blekinge-offshore-photo-montage-nogersund.jpeg\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/6d8fabf8-dd4c-4347-b463-0e7c0d5473c2\/blekinge-offshore-photo-montage-nogersund.jpeg?size=w-512\"><\/span>Blekinge Offshore, photo montage - Nogersund<\/a><\/div><div class=\"mfn-attachment\"><a class=\"mfn-attachment-link\" href=\"https:\/\/storage.mfn.se\/b63dbe3e-5e4d-402b-8b60-87a9f0ef11b1\/blekinge-offshore-map.jpeg\"><span class=\"mfn-attachment-icon\"><img decoding=\"async\" src=\"https:\/\/storage.mfn.se\/b63dbe3e-5e4d-402b-8b60-87a9f0ef11b1\/blekinge-offshore-map.jpeg?size=w-512\"><\/span>Blekinge Offshore- map<\/a><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The Blekinge Offshore wind farm, located within the municipalities of Karlshamn and S\u00f6lvesborg, comprises up to 70 wind turbines with a production of approximately 4.3 TWh of renewable electricity per year. This represents a significant addition for southern Sweden and the Blekinge Region, which sees offshore wind power as an opportunity to increase self-sufficiency in [&hellip;]<\/p>\n","protected":false},"featured_media":41810,"template":"","class_list":["post-41432","mfn_news","type-mfn_news","status-publish","has-post-thumbnail","hentry","mfn-news-tag-mfn-ci","mfn-news-tag-mfn-lang-en","mfn-news-tag-mfn-type-ir","mfn-news-tag-mfn","mfn-news-tag-mfn-ci-other","mfn-news-tag-mfn-lang-sv"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Eolus submits application for offshore wind project outside the coast of Blekinge - Eolus<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eolus submits application for offshore wind project outside the coast of Blekinge - Eolus\" \/>\n<meta property=\"og:description\" content=\"The Blekinge Offshore wind farm, located within the municipalities of Karlshamn and S\u00f6lvesborg, comprises up to 70 wind turbines with a production of approximately 4.3 TWh of renewable electricity per year. This represents a significant addition for southern Sweden and the Blekinge Region, which sees offshore wind power as an opportunity to increase self-sufficiency in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/\" \/>\n<meta property=\"og:site_name\" content=\"Eolus\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-26T12:24:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eolus.com\/wp-content\/uploads\/2024\/02\/fp4-beskuren-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1188\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/\",\"url\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/\",\"name\":\"Eolus submits application for offshore wind project outside the coast of Blekinge - Eolus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eolus.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/fp4-beskuren-scaled.jpg\",\"datePublished\":\"2024-02-26T11:40:00+00:00\",\"dateModified\":\"2024-02-26T12:24:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eolus.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/fp4-beskuren-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eolus.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/fp4-beskuren-scaled.jpg\",\"width\":2560,\"height\":1188,\"caption\":\"Vindkraftpark Blekinge Offshore\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/en\\\/blog\\\/mfn_news\\\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eolus.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MFN News Items\",\"item\":\"https:\\\/\\\/www.eolus.com\\\/blog\\\/mfn_news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Eolus submits application for offshore wind project outside the coast of Blekinge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eolus.com\\\/#website\",\"url\":\"https:\\\/\\\/www.eolus.com\\\/\",\"name\":\"Eolus\",\"description\":\"Shaping the future of renewable energy\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eolus.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Eolus submits application for offshore wind project outside the coast of Blekinge - Eolus","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/","og_locale":"en_US","og_type":"article","og_title":"Eolus submits application for offshore wind project outside the coast of Blekinge - Eolus","og_description":"The Blekinge Offshore wind farm, located within the municipalities of Karlshamn and S\u00f6lvesborg, comprises up to 70 wind turbines with a production of approximately 4.3 TWh of renewable electricity per year. This represents a significant addition for southern Sweden and the Blekinge Region, which sees offshore wind power as an opportunity to increase self-sufficiency in [&hellip;]","og_url":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/","og_site_name":"Eolus","article_modified_time":"2024-02-26T12:24:00+00:00","og_image":[{"width":2560,"height":1188,"url":"https:\/\/www.eolus.com\/wp-content\/uploads\/2024\/02\/fp4-beskuren-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/","url":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/","name":"Eolus submits application for offshore wind project outside the coast of Blekinge - Eolus","isPartOf":{"@id":"https:\/\/www.eolus.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/#primaryimage"},"image":{"@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eolus.com\/wp-content\/uploads\/2024\/02\/fp4-beskuren-scaled.jpg","datePublished":"2024-02-26T11:40:00+00:00","dateModified":"2024-02-26T12:24:00+00:00","breadcrumb":{"@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/#primaryimage","url":"https:\/\/www.eolus.com\/wp-content\/uploads\/2024\/02\/fp4-beskuren-scaled.jpg","contentUrl":"https:\/\/www.eolus.com\/wp-content\/uploads\/2024\/02\/fp4-beskuren-scaled.jpg","width":2560,"height":1188,"caption":"Vindkraftpark Blekinge Offshore"},{"@type":"BreadcrumbList","@id":"https:\/\/www.eolus.com\/en\/blog\/mfn_news\/eolus-submits-application-for-offshore-wind-project-outside-the-coast-of-blekinge\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eolus.com\/"},{"@type":"ListItem","position":2,"name":"MFN News Items","item":"https:\/\/www.eolus.com\/blog\/mfn_news\/"},{"@type":"ListItem","position":3,"name":"Eolus submits application for offshore wind project outside the coast of Blekinge"}]},{"@type":"WebSite","@id":"https:\/\/www.eolus.com\/#website","url":"https:\/\/www.eolus.com\/","name":"Eolus","description":"Shaping the future of renewable energy","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eolus.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/mfn_news\/41432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/mfn_news"}],"about":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/types\/mfn_news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/media\/41810"}],"wp:attachment":[{"href":"https:\/\/www.eolus.com\/en\/wp-json\/wp\/v2\/media?parent=41432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}