Eolus has divested two operational wind turbines

As of December 31st 2016, Eolus has divested two wind turbines in operation to private investors. The divested turbines are Gärdslösa 3 which is a model of the Enercon E82 2.0 MW commissioned 2010 and located in the municipality of Borgholm. The second turbine is Tolvmanstegen 24 which is a model of Vestas V90 2.0 MW, which was commissioned in 2012 and is located in the municipality of Strömstad.